New Design 500kw Two Stage Coal Gas Natural Gas Power Generator Plant

New Design 500kw Two Stage Coal Gas Natural Gas Power Generator Plant

New Design 500kw Two Stage Coal Gas Natural Gas Power Generator PlantCoke gas production process Coke oven gas pre-treat
Basic Info
Model NO. 300GF-3000GF
Output Type AC Three Phase
Gas Source Gas
Certification CE, ISO
Power >200kW
Standard Nonstandard
Model 300-1000gfm
Rated Power 300kw-1000kw
Fuel Type Coal
Speed 500rpm/600rpm/750rpm
Structure Inline 4 Stroke
Cooling Type Open
Connection 3p4w
Warranty One Year or 1500 Hours
Certificate Ce ISO
Intake Natural/Turbocharger
Application Power Plant, Factory Power Supply
Installation Abroad Guide Installation
Transport Package Plywood Package by Seaway
Specification 300kw-1000kw
Trademark zichai
Origin Zibo, Shandong
HS Code 850220
Production Capacity 500
Product Description
New Design 500kw Two Stage Coal Gas Natural Gas Power Generator PlantCoke gas production process
Coke oven gas pre-treatment processCoke oven gas power generation

Gas Quality Suggested
  • Gas temperature≤40ºC
  • Gas pressure 2.5~10kPa
  • Pressure change rate≤1kPa/min
  • Calorific value ≥ 4.0MJ/Nm3
  • Moisture content≤40g/Nm3, no free water
  • Impurity content≤30mg/Nm3
  • Impurity size≤5μm
  • Tar content≤50mg/Nm3
  • H2S≤50mg/Nm3
  • Total sulfur≤100mg/Nm3
  • NH3≤20mg/Nm3
  • Cl≤50mg/Nm3
  • H2≤50%
  • O2≤1%

New Design 500kw Two Stage Coal Gas Natural Gas Power Generator Plant


Gas Generator Specification

ItemTechnical specification
EngineModel6300D/M6300D/M-18300D/M-18300D/M-28300D/M-3
TypeInline, water cooled, four stroke, spark plug ignition
Non-turbocharged
Cylinder number68
Cylinder diameter (mm)300
Rated speed(r/min)500600500600600
Rated power (kW)400440500550660
Rated thermal consumption(MJ/kW·h)≤11.0
Rotate direction (From flywheel)Clockwise
Start modeCompressed air/motor start
Exhaust temperature (ºC)≤600
Oil consumption(g/kW·h)≤0.8
Generator setType350GFM400GFM 450GFM500GFM600GFM
Rated power(kW)350400450500600
Frequency(HZ)50
Voltage(V)400/6300/10500
Current(A)631/40/24722/46/28812/52/31902/57/341083/69/41
Power factor (COSΦ)0.8 (Lagging)
Phase and connecting 3phases 4wires /3phases 3wires
Dimension (L×W×H) (mm)5800×1600×29006400×1600×2900
Weight(kg)1800022000


Gas Generator Technical FeaturesØLarge cylinder, ensure stable and constant power outputLarge cylinder, long stroke, low speed and big power reserves, ensure stable and constant power output.ØLow speed ensure service lifeLow &medium speed reduces components wear, extends service life, reduces components inventory and improve economic benefit.ØNaturally aspiratedNaturally aspirated, low gas intake pressure requirement (gas pressure ≥2kPa), strong adaptability to gas pressure fluctuation.ØNon-turbocharged naturally aspirated, double tube gas intake system with high tar tolerance;Ø Intake valve kit is removable for easy maintenance;Ø External or internal mixing system can be selected according to hydrogen content;Ø Adapt to low calorific value gas with high hydrogen content;Ø High degree of automation, high safety and low operating costs.

 

New Design 500kw Two Stage Coal Gas Natural Gas Power Generator Plant


Why Zichai Gas Generator Set?1. Development and manufacturing internal combustion engine since 19702. Factory area over 330000m2 & over 2200 employees3. Highly versatile power generator with ability to handle more than 20 different gases4. More than 200 employees dedicated to developing and improving power generator for various gas.5. More than 1000 systems installed in over 20 countries using a variety of gases.6. More than 50 people in the Customer Service Department making the Organization very Customer Responsive.Project References

 

FAQ1.Are you a trading company or manufacture?Manufacture with factory.2.What kinds of gas generator set do you produce?It covers for all kinds of gas produced in agriculture and industry, including biomass gas, biogas, natural gas, coal mine gas, coke oven gas, semi-coke gas and syngas, as well as related gas produce equipment.3.What is your delivery time?Normally within 60days, it depends on the configuration and quantity, please confirm with us before order.4.What is your payment terms?T/T or L/C.5.How do you pack products?Standard export packaging. Equipment packing with plastic bag, and with new solid wooden box, suitable for long-distance sea transportation, moisture-proof, earthquake, rust-proof and anti-brutal handling.6.What is your available port of shipment?Normally Qingdao port, other ports available according to customers' requirement.